YEIDA Sector 32 Final Master Plan PDF Map

1.18 MB / 1 Pages
0 LIKES
SHARE THIS Share
DMCA / REPORT Report
YEIDA Sector 32 Final Master Plan PDF Map

YEIDA Sector 32 Final Master Plan PDF Map

The YEIDA Sector 32 Master Plan is designed to create a well-connected, industrially robust, and commercially viable urban hub. With a focus on infrastructure, energy efficiency, and economic growth, Sector 32 is poised to become a strategic business and industrial corridor in the region.

Highlights of the Plan

  • Optimized Plot Reallocation – Several plots have been modified, merged, or reallocated based on the requirements of different departments.
  • Electric Substations (ESS) – Provision for two major substations (ESS-1 & ESS-2) to meet industrial and residential electricity needs.
  • Water Works & Utility Services – Designated facility plots for water supply infrastructure (WW-1) and other essential utilities.
  • Industrial & Commercial Spaces – Planned zones for industrial activities, business centers, and mixed-use developments.
  • Transportation & Road Network – Road realignment and optimization for better traffic flow and connectivity.

Land Use & Zoning Allocations

The layout plan of Sector 32 includes the following land use designations:

  • Industrial Plots – Reorganized for enhanced manufacturing and warehousing.
  • Commercial Areas – Business hubs, retail centers, and mixed-use developments.
  • Electric Substations – ESS-1 (12 acres) and ESS-2 (5 acres) for power supply.
  • Water Works (WW-1) – Dedicated area for water treatment and distribution.
  • Transport Infrastructure – 75m-wide roads with realigned intersections for improved connectivity.

Key Modifications & Updates

  • Reallocation of Plots:
    • Plot 54 divided as per Property Department’s requirement.
    • Plots 6, 7, 8 & 9/1 merged into a single plot, and Plots 9/2 & 10 combined.
    • ITI plot (I-01) relocated to Sector 33 for better institutional planning.
    • Industrial Plots 1121 & 1122 removed due to commercial and facility area restructuring.
    • Plots 50, 51, & 52 merged into a single commercial plot.
    • Facility Plot F-6 earmarked for ATS & Commando Training Center.
    • Facility Plot F-9 extended for ESS-2 as per CEO approval.
  • Infrastructure Enhancements:
    • Five 33kVA substations planned to meet the growing energy demands.
    • Road Realignment: The 75m-wide road between Sector 32 & 33 has been adjusted for better connectivity.

Sustainability & Future Prospects

  • Green Buffers & Open Spaces for environmental sustainability.
  • Smart Infrastructure Integration for utilities and transport.
  • Planned Mixed-Use Development to enhance economic activities.
  • Enhanced Connectivity via Yamuna Expressway & Public Transport.

Download YEIDA Sector 32 Final Master Plan PDF Map

Free Download
Welcome to MasterPlansIndia!